  • Process

    Deliver Unencumbered Routes

    Before your Right of Way project gets off the ground, we assist in a thorough aerial and ground reconnaissance to aid in validating a proposed route or site.

    Our scoping study is designed to reveal unknown physical or environmental features, previously unidentified structures, topographical elements, and problem areas of acquisition that may have a direct impact on project design, cost, and ultimate feasibility.

    Skilled field professionals work directly with engineering, survey and construction personnel to choose routes that will be cost effective and environmentally sound.

    Count on us to
    • • Interpret aerial photographs, topographical maps and right-of-way plans.
    • • Detect desirable and cost-effective routes.
    • • Eliminate problem areas that may involve expensive negotiations.
    • • Analyze stakeholder and regulatory issues.
  • Process

    Protect Your Investment

    A well-executed Right of Way project is largely a result of meticulous research to identify all necessary agency permits, planning, and titles, licenses and approvals.

    Drawbridge allows nothing to fall through the cracks. We possess an extensive background in researching the necessary permits and regulatory approvals to ensure project sucess. We determine parcel ownership interests, deed of record identification, encumbrances, and outstanding judgments and liens.

    Through our due diligence process – customized to your situation – we identify regulatory gaps and assure that property rights are unencumbered before you commit to the route.

    Count on us to
    • • Secure agency permits and minimize bureaucratic red tape.
    • • Provide current surface ownerships, encumbrances, and complete title investigations.
    • • Review existing parcel files to determine if easements or leases currently exist along a proposed route.
    • • Identify title defects – such as liens – that must be cured or considered before acquisition.